English
English
Español
Français

UP TO THE MINUTE

By Emma Peterson. Pli-Dek's service support empowers contractors with training and ...
Doors open in Colorado, Arkansas and North Carolina. ABC Supply Co., ...
Read More
Geocel - Sidebar - 50th Anniversary - Feb 2024
SOPREMA - Sidebar Ad - The Right Coatings for the Right Roofs (RLW on-demand)
Western Colloid - Sidebar Ad - FAAR Best Practices (CCS)
Pli-Dek - Sidebar - Only the Best - June
Everest Systems - Sidebar - Silkoxy Samples - Aug
Progressive Materials - Sidebar - Free Samples! #2
CoatingsCoffeeShop
English
English
Español
Français

1-day garage installation? No way!

Tremco 1 Day Garage Installation
February 27, 2024 at 3:00 p.m.

By Dani Sheehan. 

Learn about this waterproof traffic coating system’s enhanced durability and performance and see why Tremco is the industry leader in roofing and weatherproofing solutions. 

Whether you’re the customer or the contractor, you want the fastest and least invasive solution when it comes to your home or building. Tremco Roofing has the right product for the job, no matter what application is needed. When Catalyst Health in Denver, Colorado, reached out to them for a traffic coating for their parking garage, they were seeking a quick turnaround and hoped to find a product that offered a longer warranty. 

Some urethane coatings can take up to a week to complete, causing costly downtime and customer frustrations. Tremco chose a Vulkem® EWS system with PUMA technology to help decrease project time and allow the owner to get back to using their garage with minimal interruption. Vulkem Extreme Wearing System (EWS) is a waterproof traffic deck coating composed of a primer, a base coat and a topcoat, all of which are cured using Tremco PUMA Initiator. PUMA stands for polyurethane-methacrylate technology, which is designed with extreme abrasion resistance and superior adhesion. 

PUMA technology can be applied in temperatures as low as 20° Fahrenheit, and each layer in the system cures within 30-45 minutes. Once complete, traffic can travel over it within an hour after installation. For the Catalyst Health Building, this meant they only lost one day to installation. Mike Bader, technical field rep for Tremco, explains, “We started this morning around 9 o’clock. It was cold this morning, 29 degrees, but the EWS doesn’t have a problem with that. So, we did 1,800 square feet just now, applying a coat in an hour, and in another hour, we’ll be able to start that second coat. 1,800 square feet will be wrapped up by five today.” 

With an industry-leading 10-year warranty, the system will protect the concrete from chloride, chemicals, gasoline, oils and several other damaging substances while giving the owner peace of mind that the areas underneath the parking structure will be free from water damage for years to come. 

Watch the video below and see for yourself why Tremco Roofing is the leading expert in PUMA technology coatings systems. 

Learn more about Tremco in their Coffee Shop Directory or visit www.tremcoroofing.com.

About Dani

Dani is a writer for The Coffee Shops and AskARoofer™. When she's not writing or researching, she's teaching yoga classes or exploring new hiking trails.



Recommended For You


Comments

There are currently no comments here.

Leave a Reply

Commenting is only accessible to RCS users.

Have an account? Login to leave a comment!


Sign In
English
English
Español
Français

UP TO THE MINUTE

By Emma Peterson. Pli-Dek's service support empowers contractors with training and ...
Doors open in Colorado, Arkansas and North Carolina. ABC Supply Co., ...
Read More
Progressive Materials - Sidebar - Free Samples! #2
AkzoNobel - Sidebar - Ceram-a-star - March
Contractor Outlook - Sponsored by SRS
SOPREMA - Sidebar Ad - The Right Coatings for the Right Roofs (RLW on-demand)
Geocel - Sidebar - 50th Anniversary - Feb 2024
APOC - CCS Sidebar - ProProgram - June